FORTE Green Power UPS

From compact online UPS to modular data center systems. Supply, runtime calculation, installation and service across Kazakhstan.

1–1250 kVAcomplete solution range24 monthswarranty and local service

FORTE UPS — always in stock

We keep FORTE UPS and batteries in stock in Almaty so facilities do not wait weeks for a factory delivery. This is especially important for urgent replacement of failed equipment and projects with tight commissioning deadlines.

A manager confirms availability of the required model and the dispatch date on the day of enquiry.

From selection to startup

01

UPS and battery selection.

We calculate power and runtime for the facility's load.

02

Supply, installation and commissioning.

Our own engineers deliver, install and test the equipment under load.

03

Warranty and local service.

A 24-month UPS warranty, a service team in Astana and Almaty, and spare parts stock.

01

Choose Your FORTE Series

We select power, phase configuration, runtime and redundancy to suit your project.

Inside the FORTE 500 kVA UPS

Modular construction with front-door access. Explore the cabinet from two angles.

01

Switchgear

The top panel contains input, output, bypass and maintenance bypass devices.

02

Modular Layout

Modules are installed in the lower cabinet. Their number and power depend on the configuration.

03

Service Access

The open front door provides access to controls and modular units.

We will configure the system for your load, runtime and redundancy requirements.

Request a Calculation

Need Specifications or a Wiring Diagram?

The dedicated catalog contains PDFs for every series in one place.

Go to Catalog

FORTE Manuals and KSTAR Documents

Documents available to view and download.

PDF · 3.1 MB

FORTE Green Power 10–40 kVA

Three-phase UPS operating manual. Installation, connection, controls and maintenance.

PDF · 8.2 MB

FORTE Green Power 60–200 kVA

Three-phase UPS operating manual. Installation, configuration and maintenance.

PDF · 0.4 MB

KSTAR Authorization Letter

PES POWER authorization to supply and service FORTE Green Power UPS. Valid from 20 November 2025 to 31 December 2026.

PDF · 0.2 MB

KSTAR Engineer Training

Installation, testing, diagnostics and repair of FORTE / KSTAR UPS. Certificate valid from 20 November 2025 to 31 December 2026.

All Documents and Certificates →

FORTE · ONLINE UPS · 3/3

FORTE EPOWER Transformer-Based UPS

EPOWER Series — 10–800 kVA. Online double-conversion UPS with a transformer, three-phase input and three-phase output.

Output power factor: 0.9. Detailed specifications and configurations are in the Russian-language catalog.

Open EPOWER Catalog · PDF
FORTE GPM3300-RT Rack/Tower
FORTE UPS series

FORTE GPM3300-RT · 10–20 kVA

Three-phase online UPS · 3U · Rack/Tower