PES POWER · Kazakhstan
UPS for data centers
Server and network outages disrupt services. Power systems must account for runtime and maintenance without interrupting the load.
What to consider
- Power per rack and total IT load — determine UPS capacity and the number of power modules.
- Redundancy arrangement — N+1 or 2N: how many modules or systems can fail without losing the load.
- Load growth — a modular UPS allows you to start with part of the capacity and add modules without interruption.
- Bypass — a maintenance bypass allows UPS servicing without shutting down servers.
- Monitoring — SNMP and MODBUS transmit status to the supervisory system.
- Operation with a generator — generator capacity is coordinated with the UPS and cooling system.
How we select a solution
We collect site data, check the load and runtime, and agree equipment, installation and service. Final range suitability is confirmed by engineering assessment.
Equipment to consider
Experience and documents
PES POWER is an authorized KSTAR partner. Our engineers have received manufacturer training.
In addition to UPS, we supply battery banks, generators, precision cooling and ready-made cabinet, modular and container data centers.
Send project details · +7 701 872 24 87
Frequently asked questions
Which UPS suits a server room with several racks?
Rack-mounted FORTE GPM3300-RT 10–20 kVA or GP33 are suitable for small server rooms. For data centers with growing loads, choose modular GPM3300.
What is N+1 redundancy?
The system has one more power module than required. If any module fails, the load remains protected.
Can capacity be increased later?
Yes. Power modules can be added to the modular cabinet without interrupting the load.
How is runtime calculated?
Use the battery calculator for a preliminary estimate; our engineers calculate it precisely based on load and temperature.
Equipment and solutions
Floor-standing online UPS, 1–20 kVA: single-phase 1–10 kVA and 10–20 kVA models with three-phase input.
Rack-mounted online UPS, 6–10 kVA, with 2U/3U/4U height depending on the version, for server cabinets.
Three-phase online UPS, 10–40 kVA, for offices, healthcare and server rooms.
Three-phase online UPS, 60–200 kVA, for large facilities and industrial sites.
Modular UPS up to 1250 kVA with 50, 100 and 125 kVA modules and N+1 redundancy for data centers.
Three-phase UPS, 10–20 kVA, with a 3U height for rack or floor installation.
Transformer-based UPS, 10–800 kVA, for industry and challenging power grids.
VRLA batteries for UPS and backup power, with runtime calculations.
PES POWER: supply, installation and service of uninterruptible power systems in Kazakhstan since 2013.
Our own FORTE Green Power UPS and FORTE Battery Systems battery brands: who manufactures them and how they differ.
Articles on UPS selection, runtime calculations and battery service life.
Uninterruptible power for operating theatres, intensive care units, CT and MRI.
Power for lifts, escalators, security systems and server rooms.
Uninterruptible power for warehouses and distribution centers: conveyors, sorting, server rooms and record-keeping systems.
Protection for control systems and process lines against shutdowns.
diagnostics and battery replacement in UPS from any manufacturer.
scheduled maintenance, repairs and service contracts.
Wokang and Silico generators in open, enclosed and containerized configurations.
single-phase and three-phase, from 3.5 to 1200 kVA.
turnkey KSTAR cabinet, modular and containerized data centers.
PES POWER projects completed in Kazakhstan.