PES POWER · Kazakhstan
FORTE GP33 10–40 kVA
FORTE GP33 10–40 kVA — three-phase transformerless online UPS for offices, server rooms, medical facilities and retail sites. Efficiency up to 94.5%.
S versions have built-in batteries in a single enclosure; H versions have a compact enclosure for connecting external battery cabinets. Parallel operation supports redundancy and capacity expansion.
Common specifications
- 3/3 phases; output 380/400/415 V; PF 1.0. S models have built-in batteries; H models use external batteries for extended runtime.
- USB, RS232, RS485, parallel port, dry contacts and intelligent slot. Options: SNMP card, relay card and battery temperature sensor.
Models and specifications
| Model | Power kVA / kW | Online efficiency, up to % | Dimensions W × D × H, mm | Weight, kg | Batteries / DC bus |
|---|---|---|---|---|---|
| GP3310S | 10 kVA / 10 kW | 93,5 | 250 × 900 × 868 | 129 | Built-in; 20 × 12 V 9 Ah (option 2 × 20); ±120 V |
| GP3310H | 10 kVA / 10 kW | 93,5 | 250 × 580 × 655 | 35 | External; ±96 / ±108 / ±120 V; 16–20 batteries |
| GP3315S | 15 kVA / 15 kW | 94,5 | 250 × 900 × 868 | 186 | Built-in; 2 × 20 × 12 V 9 Ah; ±120 V |
| GP3315H | 15 kVA / 15 kW | 94,5 | 250 × 580 × 655 | 39 | External; ±96 / ±108 / ±120 V; 16–20 batteries |
| GP3320S | 20 kVA / 20 kW | 94,5 | 250 × 900 × 868 | 187 | Built-in; 2 × 20 × 12 V 9 Ah; ±120 V |
| GP3320H | 20 kVA / 20 kW | 94,5 | 250 × 580 × 655 | 40 | External; ±96 / ±108 / ±120 V; 16–20 batteries |
| GP3330S | 30 kVA / 30 kW | 94,5 | 250 × 900 × 868 | 236 | Built-in; 3 × 20 × 12 V 9 Ah; ±120 V |
| GP3330H | 30 kVA / 30 kW | 94,5 | 250 × 580 × 655 | 43 | External; ±96 / ±108 / ±120 V; 16–20 batteries |
| GP3340S | 40 kVA / 40 kW | 94,5 | 250 × 900 × 868 | 239 | Built-in; 2 × 30 × 12 V 9 Ah; ±180 V |
| GP3340H | 40 kVA / 40 kW | 94,5 | 250 × 580 × 655 | 46 | External; ±180…±300 V; 30–50 batteries |
How GP33 differs from EPOWER
GP33 UPS are transformerless: lighter, more compact and more efficient. EPOWER UPS are transformer-based for industrial grids with demanding loads.
Model codes are similar, so specify the series name when ordering.
Supply and service
FORTE Green Power UPS are manufactured at KSTAR. Display menus and documentation are available in Russian and Kazakh.
Certificates and authorizationRequest a quotation · Runtime calculator
Frequently asked questions
How do I order?
Send PES POWER your load, required runtime, phases and installation city. Price and lead time are confirmed in the quotation.
Can runtime be determined from kVA alone?
No. Active load, battery configuration and discharge data are required.
The calculator provides a preliminary estimate.
Is service available in Kazakhstan?
PES POWER provides installation and service, with offices in Astana and Almaty and a warehouse in Almaty. The scope is agreed separately.
Equipment and solutions
Floor-standing online UPS, 1–20 kVA: single-phase 1–10 kVA and 10–20 kVA models with three-phase input.
Rack-mounted online UPS, 6–10 kVA, with 2U/3U/4U height depending on the version, for server cabinets.
Three-phase online UPS, 60–200 kVA, for large facilities and industrial sites.
Modular UPS up to 1250 kVA with 50, 100 and 125 kVA modules and N+1 redundancy for data centers.
Three-phase UPS, 10–20 kVA, with a 3U height for rack or floor installation.
Transformer-based UPS, 10–800 kVA, for industry and challenging power grids.
VRLA batteries for UPS and backup power, with runtime calculations.
PES POWER: supply, installation and service of uninterruptible power systems in Kazakhstan since 2013.
Our own FORTE Green Power UPS and FORTE Battery Systems battery brands: who manufactures them and how they differ.
Articles on UPS selection, runtime calculations and battery service life.
Modular UPS with N+1 redundancy, batteries, generators and cooling.
Uninterruptible power for operating theatres, intensive care units, CT and MRI.
Power for lifts, escalators, security systems and server rooms.
Uninterruptible power for warehouses and distribution centers: conveyors, sorting, server rooms and record-keeping systems.
Protection for control systems and process lines against shutdowns.
diagnostics and battery replacement in UPS from any manufacturer.
scheduled maintenance, repairs and service contracts.
Wokang and Silico generators in open, enclosed and containerized configurations.
single-phase and three-phase, from 3.5 to 1200 kVA.
turnkey KSTAR cabinet, modular and containerized data centers.
PES POWER projects completed in Kazakhstan.