UPS for warehouses and logistics

Terminals, communications, servers and warehouse automation need coordinated backup power. IT loads and motor drives must be assessed separately.

What to consider

  • Critical consumers — server room, warehouse management system, data collection terminals, communications and sorting lines.
  • Runtime — until the generator starts or operations can be completed correctly.
  • Phases and load distribution — across warehouse zones.
  • Temperature — batteries lose capacity in unheated areas; UPS and batteries should be installed in a heated room.
  • Generator integration — for warehouses with refrigeration equipment and round-the-clock operation.

How we select a solution

We collect site data, check the load and runtime, and agree equipment, installation and service. Final range suitability is confirmed by engineering assessment.

Equipment to consider

Experience and documents

In 2025, PES POWER installed UPS at the Ozon logistics complex in Astana.

PES POWER projects · Certificates

Send project details · +7 701 872 24 87

Frequently asked questions

What should be protected by UPS first in a warehouse?

Servers, the network, the warehouse management system and sorting equipment: their failure brings shipments to a halt.

Is a generator necessary?

Yes, if downtime is unacceptable beyond battery runtime. The UPS covers the interval until the generator starts.

How quickly can you supply equipment?

From the Almaty warehouse: 1–2 days; factory orders: up to 40 days.