PES POWER · Kazakhstan
UPS for warehouses and logistics
Terminals, communications, servers and warehouse automation need coordinated backup power. IT loads and motor drives must be assessed separately.
What to consider
- Critical consumers — server room, warehouse management system, data collection terminals, communications and sorting lines.
- Runtime — until the generator starts or operations can be completed correctly.
- Phases and load distribution — across warehouse zones.
- Temperature — batteries lose capacity in unheated areas; UPS and batteries should be installed in a heated room.
- Generator integration — for warehouses with refrigeration equipment and round-the-clock operation.
How we select a solution
We collect site data, check the load and runtime, and agree equipment, installation and service. Final range suitability is confirmed by engineering assessment.
Equipment to consider
Experience and documents
In 2025, PES POWER installed UPS at the Ozon logistics complex in Astana.
Send project details · +7 701 872 24 87
Frequently asked questions
What should be protected by UPS first in a warehouse?
Servers, the network, the warehouse management system and sorting equipment: their failure brings shipments to a halt.
Is a generator necessary?
Yes, if downtime is unacceptable beyond battery runtime. The UPS covers the interval until the generator starts.
How quickly can you supply equipment?
From the Almaty warehouse: 1–2 days; factory orders: up to 40 days.
Equipment and solutions
Floor-standing online UPS, 1–20 kVA: single-phase 1–10 kVA and 10–20 kVA models with three-phase input.
Rack-mounted online UPS, 6–10 kVA, with 2U/3U/4U height depending on the version, for server cabinets.
Three-phase online UPS, 10–40 kVA, for offices, healthcare and server rooms.
Three-phase online UPS, 60–200 kVA, for large facilities and industrial sites.
Modular UPS up to 1250 kVA with 50, 100 and 125 kVA modules and N+1 redundancy for data centers.
Three-phase UPS, 10–20 kVA, with a 3U height for rack or floor installation.
Transformer-based UPS, 10–800 kVA, for industry and challenging power grids.
VRLA batteries for UPS and backup power, with runtime calculations.
PES POWER: supply, installation and service of uninterruptible power systems in Kazakhstan since 2013.
Our own FORTE Green Power UPS and FORTE Battery Systems battery brands: who manufactures them and how they differ.
Articles on UPS selection, runtime calculations and battery service life.
Modular UPS with N+1 redundancy, batteries, generators and cooling.
Uninterruptible power for operating theatres, intensive care units, CT and MRI.
Power for lifts, escalators, security systems and server rooms.
Protection for control systems and process lines against shutdowns.
diagnostics and battery replacement in UPS from any manufacturer.
scheduled maintenance, repairs and service contracts.
Wokang and Silico generators in open, enclosed and containerized configurations.
single-phase and three-phase, from 3.5 to 1200 kVA.
turnkey KSTAR cabinet, modular and containerized data centers.
PES POWER projects completed in Kazakhstan.