Manuals and Certificates

Manufacturer documents, operating instructions and evidence of our service team’s training.

Operating Documentation

Select the manual for your equipment model and power rating.

PDF · 3.1 MB

FORTE Green Power 10–40 kVA

Three-phase UPS operating manual. Installation, connection, controls and maintenance.

PDF · 8.2 MB

FORTE Green Power 60–200 kVA

Three-phase UPS operating manual. Installation, configuration and maintenance.

SILICO ENERGY Generator Manual · PDF ↗

Authorization and Engineer Training

Manufacturer authorization letter and PES POWER specialist training certificates.

PDF · 0.4 MB

KSTAR Authorization Letter

PES POWER authorization to supply and service FORTE Green Power UPS. Valid from 20 November 2025 to 31 December 2026.

PDF · 0.2 MB

KSTAR Engineer Training

Installation, testing, diagnostics and repair of FORTE / KSTAR UPS. Certificate valid from 20 November 2025 to 31 December 2026.

PDF · 0.7 MB

Wokang Power Engineer Training

Generator operation, installation, commissioning and servicing. Training completed in June 2026.

FORTE GPM3300-RT Rack/Tower
FORTE UPS series

FORTE GPM3300-RT · 10–20 kVA

Three-phase online UPS · 3U · Rack/Tower