FORTE × KIJO
UPS Runtime Calculator
Select the power rating and required runtime to find a suitable battery capacity.
FORTE GP33
30 kVA / kWCalculation at 100% load
Preliminary selection
KIJO batteries
1 strings × 40 = 40 batteries of the same model
A selection of 32–50 batteries per string applies only to models supporting the corresponding battery voltage range. An engineer must confirm compatibility and settings.
This is a preliminary estimate. Contact PES POWER engineers for an accurate runtime calculation.
Confirm configuration via WhatsAppThe calculation parameters will be included in your message.How runtime is calculated
For 1 / 2 / 3 kVA, the standard set contains 2 / 4 / 6 batteries rated 9 Ah respectively, providing approximately 5 minutes at full load. The total number of batteries increases in multiples of the standard set, including internal batteries. Runtime is estimated as 5 minutes × number of sets. For example, at 3 kVA: 6 batteries — 5 minutes, 12 — 10 minutes, 18 — 15 minutes.
* Selection is based on indicative PES POWER data at full load, PF 1.0 and 96% efficiency. Values do not guarantee runtime. For 10–200 kVA, the base string contains 40 batteries; for 250 kVA, source data is for 2 strings (80 batteries); for 300 kVA, it is for 3 strings (120 batteries).
For 10–300 kVA, runtime is provisionally scaled in proportion to the total number of batteries relative to the original configuration, then increased by 3% based on a PES POWER estimate. This increase is an assumption, not a verified runtime margin. It does not apply to 6 kVA or 1–3 kVA. This is a simplified estimate, not an exact discharge characteristic. Automatic selection first checks 40 batteries and available capacities in one string, then adjusts the count up to 50 before adding strings. Manual selection allows 32 to 50 batteries. For 15 kVA, the average of the 10 and 20 kVA data is used. The 24–26 Ah capacity is shown as a range; an engineer selects the exact KIJO model. Other capacities, including 150 Ah, require an individual calculation.
An engineer will check discharge characteristics, currents, DC bus voltage, charger, temperature and battery condition. For 6 kVA, a string of 40 batteries is used: 7.5 Ah — 25 minutes, 9 Ah — 30 minutes, 17 Ah — 70 minutes, 26 Ah — 115 minutes.
Open battery datasheetsEquipment and solutions
Floor-standing online UPS, 1–20 kVA: single-phase 1–10 kVA and 10–20 kVA models with three-phase input.
Rack-mounted online UPS, 6–10 kVA, with 2U/3U/4U height depending on the version, for server cabinets.
Three-phase online UPS, 10–40 kVA, for offices, healthcare and server rooms.
Three-phase online UPS, 60–200 kVA, for large facilities and industrial sites.
Modular UPS up to 1250 kVA with 50, 100 and 125 kVA modules and N+1 redundancy for data centers.
Three-phase UPS, 10–20 kVA, with a 3U height for rack or floor installation.
Transformer-based UPS, 10–800 kVA, for industry and challenging power grids.
VRLA batteries for UPS and backup power, with runtime calculations.
PES POWER: supply, installation and service of uninterruptible power systems in Kazakhstan since 2013.
Our own FORTE Green Power UPS and FORTE Battery Systems battery brands: who manufactures them and how they differ.
Articles on UPS selection, runtime calculations and battery service life.
Modular UPS with N+1 redundancy, batteries, generators and cooling.
Uninterruptible power for operating theatres, intensive care units, CT and MRI.
Power for lifts, escalators, security systems and server rooms.
Uninterruptible power for warehouses and distribution centers: conveyors, sorting, server rooms and record-keeping systems.
Protection for control systems and process lines against shutdowns.
diagnostics and battery replacement in UPS from any manufacturer.
scheduled maintenance, repairs and service contracts.
Wokang and Silico generators in open, enclosed and containerized configurations.
single-phase and three-phase, from 3.5 to 1200 kVA.
turnkey KSTAR cabinet, modular and containerized data centers.
PES POWER projects completed in Kazakhstan.